Marina Infrastructure at Calypso Bay Marina

Returning for Stage 3 with marine pedestals, shore power and safety infrastructure.
4 January 2026 by
Marina Infrastructure at Calypso Bay Marina
Adam Bruce
| No comments yet

M-Tech is proud to once again support the Calypso Bay Marina with reliable and proven marina infrastructure. This project marks the second supply by M-Tech, following previous installations delivered during Stages 1 and 2 of the marina’s development.

For the latest stage, M-Tech supplied over 50 Platinum Marine Pedestals – 250, delivering safe and consistent shore power across the marina. The scope also included more than 20 extinguisher cabinets and fire hose reels, supporting day-to-day marina safety and operations.

Covering approximately 1,800 square metres, the marina accommodates around 110 berths across more than 200 pontoons, requiring infrastructure designed for continuous use in a demanding marine environment.

The illuminated marine pedestals play a key role in supporting safe berthing and overnight operations, contributing to a functional and reliable marina environment.

This repeat engagement reflects confidence in M-Tech’s products and reinforces our commitment to delivering practical, long-lasting solutions for marinas across Australia.

Sign in to leave a comment